The office area prior to refurbishment, looking tired and dated.
The old partitioning showing its age.
Our team start strip-out work and the existing partitions are dismantled.
Plasterboards stacked ready for proper disposal and recycling where possible.
The office is almost cleared as the old carpet tiles are removed to give us a 'clean slate' to work on.
New floor coverings now laid and masking tape on the carpet shows the office layout.
Our guys hard at work fixing the partitioning floor track ready for the upright studs.
The framework continues to be fitted with head channels fixed to ceiling and metal partitioning sections stood upright.
All the metal stud work is in place ready for the new plasterboards.
Partitioning starts to take shape as the first layer of plasterboard is installed.
Second layer of plaster boards has been fitted, taped and filled ready for painting.
Rockwool slab insulation is fitted to the partition cavity not only to stop heat loss but to aid sound reduction between offices.
The frames for the door and single glazed partitioning modules now fitted as the office refurbishment continues.
Double skin of plasterboards are finished, this second layer helps reduce noise travel between office dividing walls.
Our fit-out team are almost finished with this refit, the glazing and door modules to each office are now in place.