New office development in a business park on the outskirts of Leeds, now home to AJ Social care.
Spacious Ground floor office with carpet tiles fitted before we start fitting any new partitions.
Masking tape on floor shows the office plan to allow client to visualise proposed new layout; it's easy to change at this stage before building any partitioning.
Fit out materials on ground floor with plastic floor protection to carpets, 50mm studs and track fitted for receiving plasterboards.
New dividing walls started with blue soundblock plasterboards used to aid sound reduction.
New full height frameless glass partitions form the interview rooms, with full height glass doors. All dividing walls use sound block plasterboards.
The finished modern reception area certainly gives visitors that wow feeling when entering. Note the warmth from the wooden oak flooring.
Frameless glass forming a corridor allows the light to flood into the reception area .
Panorama showing glass partitioning leading to the waiting area complete with wall mounted TV, all wiring concealed within the partition.
One of the best pictures of the new reception area showing the impressive look that can be achieved with cost-effective materials.
Solid partitioning with stop ends in RAL 9006, all joints taped and filled and painted to match clients corporate colours.
Modern room numbering was added with manifestations in Opal frost applied to the inside of the double glazing.
Kitchen tea point in silver gloss finish with stainless steel sink and separate drainer, chrome mixer tap.
Office desks placed together to form training/board room table. Office desks finished in Maple.
Wide angle view of a meeting room table and six chairs, office partitioning in Tenon Fire and Sound for noise reduction.
Economical yet modern furniture finishes off the staff break out area nicely making it a pleasant area to relax in.
The office Kitchen area also has a breakfast bar installed, we also fitted data points to allow internet access for staff during breaks.
New concealed cloak room part finished with tape and fill joints awaiting final coat.
Elegant ash double and single door sets stand out against the partition painted in the clients corporate colours.
MD's and PA's office part built using sound block plasterboards for better sound proofing.
Almost done, 2 Maple doors with vision panels now fitted along with the installation of the double glazed modules.
Better view of the office doors inset in a 'V' shape for visual appeal.
Alternate view showing the modern Tenon Fire and Sound partitions. Also note the Corporate Identity continued with the 'squares' manifestation.