Office fit out project with glass

75mm glass partitioningWe have recently completed our large office fit out project in Knottingley, West Yorkshire. The extensive fit out project over 2 floors was for a reputable and large recycling firm who invited Rodley Interiors to first attend  a site survey, offer layout plans and offer a quotation.

Once we were awarded the project we set to work first setting the layout of the area then began to fix the partitioning forming;

  • A large office to the Ground floor area.
  • 4 large meeting rooms and offices to the 1st floor area.

Half height glazing

Glass office partitioning100mm solid partitioning

One of the main features of this aesthetically pleasing project was the partitioning profile. By installing half height glazed modules within the dividing walls ensured the maximization of natural light with each office area. Each half height glazed module we installed was double glazed to eliminate sound travel between the offices.

Fire and Sound partitioning

Carrying on with the theme of minimum sound travel with the double glazing, we installed 100mm solid partitioning modules to aid further with sound reduction between the offices.

Office tea point in West YorkshireOffices formed with half height glazingOffice fit out in KnottingleyOffice fit out in Knottingley

Additional office fit out services

In addition to installation of office partitioning we carried out the following;

  • Install of a new office tea point.
  • New suspended ceiling to whole 1st floor area.
  • New LED light fittings including emergency fittings.