Lets talk about: A Leeds Office Refurbishment

new-offices-with-frameless-glass-in-leedsWe are taking a look back at one of our favourite Leeds Office Refurbishment projects. Even though the Leeds Office project was carried out some years ago, the partitioning installed looks as modern and fresh as the day it was installed.

The space in Leeds featured floor to ceiling height frameless glass partitioning. What makes this project the extra bit special is the contrast of the glazing to the joinery works.  The existing joinery works on the floor was exquisite in a light Ash.

frameless-glass-door-and-handle-detail-installed-in-leedsTo create the new office areas we fitted 10mm frameless glazing with a corporate manifestation detail applied. The manifestation text is layer cut out of the Opal Frost film. This window frosting is easy to install and remove and adds flare to any office glazing.

In addition to the new offices, we continued our works throughout all 6 floors of the building.  See our Case Study here