Office Frameless Glass Walls Leeds

Office Frameless Glass

Works are now complete on our latest office frameless glass walls installation for a Leeds based stem cell company. The project features new 10mm toughened frameless glass partitioning forming 3 individual workspaces. The partitions run up to the ceiling height of 2700mm and feature dry joints for a seamless look. The glazing is fitted with a narrow channel to the top and bottom.

Each office has also fitted a full length single glazed door with satin stainless steel door furniture. To add some privacy the meeting room area was complete with a manifestation banded film in Opal Frost. The offices themselves were completed with 2 rows of manifestation dots where privacy wasn’t as important. To ensure the difference in the films wasnt too apparant the dots were also applied in an Opal Frost finish.

This project was completed with 2 weeks and also featured framed glass partitioning to the workspace also complete with banded manifestation detailing.

Office Frameless Glass