Our clients expanding business required them to relocate to a larger office. The new space needed some major refurbishment works to modernise it and suitable for their business and staff needs.

Reusing office partitioning

The existing partitioning was in good condition, so we were able to reuse this – saving the client a considerable amount! The partitions were relocated and configured to create the new office layout. We fitted the partitions to form a curved corridor leading through the workspace and create an impressive board room exterior.

Striking glass manifestation

The curved full-height glass partition corridor was further enhanced with a custom manifestation with a vintage Leeds street map design. This type of window film adds more visual interest than a standard frosted effect while still keeping a degree of privacy. They’re a great way to get a big “wow” factor for a low cost.

custom glass manifestation with street map design

new office carpet tilesremoving old office carpet

From the floor up

We started with a strip out and removal of the old carpet tiles. We installed Burmatex Tivoli carpet tiles, using various shades to add interest and demark certain areas. These are a great cost-effective way to add some interest and break up a large expanse of carpeting. A dark plank-style vinyl (Duraflor Momenta) was installed in the kitchen areas on both floors.

Energy-saving lighting

For maximum effect we installed low level LED circular lights above the boardroom table to maintain the corporate effect.

We replaced the out-dated high-frequency light fittings with energy-efficient LED panels as well as adding motion sensors for the lights and replacing the light switches. As with most office refurbishments, we added electrical sockets and data points to suit the layout and new desk configurations along with hidden HDMI cabling for the TVs in the boardroom and meeting rooms.

circular pendant lights fitted in new boardroom

Stylish kitchens

At Rodley’s we believe an appealing, well-designed office kitchen and breakout space is very beneficial for staff. The design here used white marble effect counter-tops, oak block tables and pendant lighting to add a luxury feel that their team would be happy to use. Paired with the grey gloss kitchen from Howdens Clarkenwell, this is a million miles away from some of the drab, uninviting office kitchens out there.

Security System Installation

We supplied and installed a new intruder alarm system for Yorkshire Gas & Power. This Smartcom communicator has full remote control and allows for monitoring via mobile phones. We also installed a new door access system with a desktop reader for programming. The existing fire alarm was serviced and certified on completion.

Everything Else!

Along with all of the above we installed new ceiling tiles, fire-board ceiling to the electrical room, painted & decorated throughout, added new aluminium stair nosings, installed new toilet sinks and more.

boardroom table
new reception table and chairs
replaced stair nosings

This project highlights that Rodley Interiors are more than just a partitioning installer; we offer a complete turnkey solution for all aspects of refurbishing an office.

After obtaining various quotations for our office refurbishment project in Leeds, Yorkshire Gas and Power decided to appoint Rodley Interiors to complete the fit out works to our new unit, from start to finish the team on site were punctual, polite and carried out a high standard of works with in budget and the project was completed within the timescales agreed, We thought Rodley Interiors were the perfect partner to work with for our refurbishment project and they proved us right.

Mark Whitton
Sales Director
Yorkshire Gas and Power